Activities for 03/09/2015 to 03/20/2015

  • RM 967 to Jerry’s Lane will have construction activity related to base, topsoil, signal maintenance, seed and blanket, ditch prep, and prime coat.
  • Jerry’s Lane to McKinnon Loop will have construction activity related to placing base, prime coat topsoil, and ditch prep.
  • McKinnon Loop to the Travis County Line will have construction activity related to placing base, prime coat, topsoil, placement of the hazardous waste trap, and moving stockpile.
  • Travis County Line to Brodie Lane will have construction activity related to placing base, prime coat, signal work at Bliss Spillar, topsoil, ditch prep, riprap, and concrete driveways.

The base course activities will create a moderate impact to traffic in some areas. All other activities will have a minimal impact to traffic.